Phone: 01983 527575
All the beauty of wood with none of the problems
Decking designs | Decking components | Build a deck
Easy to build - that's Ezedeck!
EZEDECK can be installed using tools that you probably already have. You'll need a spade, hand saw, mitre box, power drill, screw driver, tape measure, spirit level, square, chalk line, and hammer. If a large number of angled cuts are required, an electric mitre saw will make life easier. Full instructions are provided.
EZEDECK installation requires the following steps:
1. The construction of the supporting substructure comprising galvanised steel posts concreted into the ground to which a softwood perimeter frame is bolted.
2. Positioning of joists - these are fixed to the perimeter frame using either standard joist hangers (available from DIY stores and builders merchants), cross-nailed or through nailed where the joists are staggered.
3. Fixing of decking boards using the proprietary EZEDECK fixing clips
4. Installation of the posts - these slide over the galvanised steel posts and are finished with end caps
5. Installation of the balustrades (handrails, balusters, inserts and optionally the decorative finials)
6. Fixing of finishing boards (decking boards) to hide the substructure
A DIY enthusiast can build a simple single-tier deck over two weekends. The intervening week allows the concrete to "go-off", though using a quick-drying premix such as Postcrete™ will shorten the time. Professional design and installation firms can construct one of the sophisticated designs shown in the gallery inside a week.
 
 
 

        